Quality Score
TalScore rolls four verifiable signals into one 0–100 number that employers can sort and gate by. Here is exactly how every point is earned — and how we stop it from being gamed.
Each dimension answers a question an employer actually cares about. The weights add up to 100.
Can they actually do the work — not just talk about it?
Every engineer passes a practical AI technical interview before they can be matched. That 0–100 score maps directly onto 25 points. It is the capability baseline; nobody skips it.
Can they prove it under exam conditions?
Points come from timed, proctored certification exams — L1 = 8, L2 = 16, L3 = 25 per track, capped at 25. Self-reported résumé skills earn nothing here. Only what was verified counts.
Did the engineer deliver on time, every time?
The largest slice — real ratings from employers after real jobs. We use a Bayesian average, not a raw one, so a single glowing review cannot game the number.
Do they finish what they start, without disputes?
One point per completed order (capped at 10) plus a 10-point no-dispute bonus. But there is a red line: if more than 1 in 10 jobs ends in a dispute, this entire 20-point dimension drops to zero.
| Dimension | Max | How it is earned |
|---|---|---|
| AI Technical Screening | 25 | Onboarding AI interview score (0–100) mapped linearly to 0–25. |
| Platform Certification | 25 | Highest level per track: L1 = 8, L2 = 16, L3 = 25. Summed across tracks, capped at 25. |
| Employer Rating | 30 | Bayesian-averaged star rating (prior: 5 reviews at 3.5★) mapped from 0–5 stars onto 0–30. |
| Reliability | 20 | 1 point per completed order (cap 10) + 10 for a clean record. Dispute rate over 10% → the whole dimension is 0. |
A raw average lets one 5-star review rocket a brand-new engineer to the top of the list. Instead, every engineer starts as if they already had 5 reviews at 3.5 stars — the platform-wide prior. Real reviews then pull the number toward the truth as they accumulate. A veteran with 40 honest reviews reflects their real record; a newcomer with one review does not get to fake a perfect one.
Reliability is not a nice-to-have — it is a gate. Completed orders and a clean dispute record build it up, but if more than 10% of an engineer’s jobs end in a dispute, the whole 20-point dimension collapses to zero. No partial credit. On industrial sites, a pattern of disputes is disqualifying, and the score treats it that way.
The final 0–100 score maps to a badge employers see at a glance.
TalScore is recomputed on the events that actually change an engineer’s standing: every completed order, every new review, and every certification issued. There is no monthly batch job to wait for — the moment the underlying facts move, so does the score.
Employers sort and gate their shortlist by TalScore. Engineers raise it by getting certified and delivering clean, on-time work.